Acclimatising your flooring

Let the floor get used to the room before it goes down, so it does not shrink or swell after.

How long?

FloorTypical time
Laminate48 hours
Vinyl plank24–48 hours
Engineered wood48–72 hours
Solid hardwoodUntil boards reach the target moisture content, often 5–7 days
TileNot needed, but store adhesive and grout at room temperature

How to do it

Installing in a building that is still drying out, after plastering or a new screed, is the most common cause of wood floor problems. Wait until the building is dry.