Solid boards are milled from one piece of wood, usually 18–22 mm thick, with a tongue on one side and a groove on the other. They are fixed to the subfloor: blind-nailed through the tongue into a timber subfloor, or glued down on screed.
What makes solid wood different
Solid wood moves more than any other floor. A wide board can change width noticeably between a dry winter and a humid summer. Most installation problems, such as gaps, cupping and crowning, come from moisture, not from workmanship.
Key numbers
| Rule | Typical value |
|---|---|
| Acclimatise | No fixed time: install when the boards' moisture content matches the room and the subfloor. Tropical species can take 2–3 times longer |
| Room conditions | As your flooring maker specifies. NWFA's North American range is 16–27 °C (60–80 °F) and 30–50% relative humidity; European makers often give different ranges |
| Moisture difference | Wooden subfloor no more than 2% wetter than plank flooring (76 mm / 3" and wider), or 4% for narrow strip |
| Expansion gap | Equal to the board thickness: 19 mm for 3/4" boards |
| Fixings | Plank (76 mm / 3" and wider): every 15–20 cm (6–8"). Strip: every 20–25 cm (8–10"). Always 2.5–7.5 cm (1–3") from each end, at least 2 per board |
| End joint stagger | At least twice the board width (24 cm for 12 cm boards) |
| Subfloor flatness | Within 5 mm over 1.8 m, or 6 mm over 3 m (3/16" in 6', 1/4" in 10') |
Installation in short
- Measure the moisture of the subfloor and of several boards with a pin moisture meter.
- Over an unheated space (crawlspace, garage), lay a Class II vapour retarder such as #15 asphalt felt, overlapped about 10 cm (4"). Over a heated room at the same conditions, none is needed. Mark the joist positions on the walls.
- Run boards perpendicular to the joists. To run them parallel, first add a second layer of plywood or OSB (at least 12 mm / 15/32") or brace between the joists. Boards wider than 127 mm (5") are best nailed with a supplementary elastomeric adhesive (glue-assist).
- Snap a straight chalk line for the first row at the gap distance plus board width from the wall. Walls are not straight; the line is.
- Face-nail the first row on the wall side, then blind-nail through the tongue.
- Rack out several rows of boards on the floor before nailing to plan joint spacing and colour.
- Use the flooring nailer from the third row on. The last rows are face-nailed or glued where the nailer cannot fit.
- Sand and finish if the boards are unfinished, then fit skirting.
Never install solid wood straight onto fresh screed, over a damp crawl space, or in a room that has not been heated yet. Wait until the building is dry and lived-in.
Wood flooring guidance on this page follows the NWFA Wood Flooring Installation Guidelines (2025 edition) from the US National Wood Flooring Association, written for North America. In Europe, national codes apply instead, such as BS 8201 in the UK and DIN 18356 in Germany, and climate ranges often differ. Your flooring maker's instructions come first: if they say something different, follow them.
Browse solid hardwood flooring on Amazon
Spot an error or something out of date? Tell us and we will fix it. How we check our information