Solid hardwood flooring

The original floor. It lasts a lifetime and can be sanded many times, but it rewards careful moisture checks and patience.

As an Amazon Associate I earn from qualifying purchases.

Solid boards are milled from one piece of wood, usually 18–22 mm thick, with a tongue on one side and a groove on the other. They are fixed to the subfloor: blind-nailed through the tongue into a timber subfloor, or glued down on screed.

What makes solid wood different

Solid wood moves more than any other floor. A wide board can change width noticeably between a dry winter and a humid summer. Most installation problems, such as gaps, cupping and crowning, come from moisture, not from workmanship.

Key numbers

RuleTypical value
AcclimatiseUntil the boards reach the room's moisture content, often 5–7 days
Moisture differenceBoards and timber subfloor within 2% (wide boards) to 4% (narrow strip)
Expansion gapAbout 15 mm, or the board thickness
FixingsOne cleat or staple every 20–25 cm, and 5–7 cm from each end
End joint staggerAt least 15 cm, more for wide boards

Installation in short

  1. Measure the moisture of the subfloor and of several boards with a pin moisture meter.
  2. Lay underlay paper and mark the joist positions on the walls.
  3. Run boards across the joists where possible.
  4. Snap a straight chalk line for the first row at the gap distance plus board width from the wall. Walls are not straight; the line is.
  5. Face-nail the first row on the wall side, then blind-nail through the tongue.
  6. Rack out several rows of boards on the floor before nailing to plan joint spacing and colour.
  7. Use the flooring nailer from the third row on. The last rows are face-nailed or glued where the nailer cannot fit.
  8. Sand and finish if the boards are unfinished, then fit skirting.

Never install solid wood straight onto fresh screed, over a damp crawl space, or in a room that has not been heated yet. Wait until the building is dry and lived-in.

Browse solid hardwood flooring on Amazon